How it works

From first call to house-warming in five steps

A clear process with fixed prices and fixed dates. Here is exactly what happens, what you get and what we need from you at each stage.

  1. 1Day 1

    Meet a designer

    At home, online or at our Dommasandra experience centre.

  2. 2Week 1 to 2

    3D design and quote

    See every room in 3D with an itemised, line-by-line quote.

  3. 3Sign-off

    Book with 10%

    Lock the design and price. Refundable until production starts.

  4. 4Day 1 to 40

    Factory and site work

    Units are made in our factory while civil and electrical work runs on site.

  5. 5Day 45*

    Move in

    Deep clean, final walkthrough and your warranty card at handover.

Step by step

What happens at each stage

1Day 1

Meet a designer

A designer meets you at home, online or at our Dommasandra experience centre to understand your family, your routines and your budget. If you have keys, a site engineer takes laser measurements.

What you get
Initial ideas, a budget range and a site measurement report
How long
About 1 hour, on a day that suits you
What we need from you
Your floor plan or builder drawing, photos of styles you like
2Week 1 to 2

3D design and quote

Your designer builds every room in 3D and prepares an itemised quote with every panel, finish and fitting listed. You can change anything until it feels right.

What you get
3D views of each room and a line-by-line quote
How long
1 to 2 weeks, usually 2 or 3 meetings
What we need from you
Quick feedback on each round so we can lock the design
3Sign-off

Book with 10%

When you are happy with the design and price, you book with 10%. We sign an agreement that fixes the scope, the price and the handover date.

What you get
A signed agreement with scope, price, payment milestones and handover date
How long
1 day
What we need from you
10% booking amount, ID and address proof for the agreement
4Day 1 to 40

Factory and site work

Kitchen and wardrobe units are made in our factory while civil, electrical, false ceiling and painting work runs on site. Units arrive finished and are installed in days.

What you get
Daily photo updates, a weekly video walkthrough and milestone quality checks
How long
Day 1 to day 40
What we need from you
Society permissions for work hours and material movement
5Day 45*

Move in

We deep clean the home and walk through every room with you. Anything you are unhappy with goes on a snag list that we close before handover.

What you get
Keys to a move-in ready home, your warranty card and care guide
How long
Day 45* for most apartments
What we need from you
An hour for the final walkthrough
Payments

Pay in four milestones, never upfront

You pay as work progresses. Every milestone comes with a GST-compliant tax invoice. Package prices are shown before GST, and 18% GST is added on each invoice.

EMI from 12 to 36 months is available through partner banks and NBFCs.

MilestoneWhenShare
BookingWhen you sign off the design and quote10%
ProductionBefore factory production starts50%
InstallationWhen modular units arrive on site35%
HandoverAfter the final walkthrough and snag closure5%
Quality checks

146 checks between the factory and your front door

Our project managers run a written checklist at every milestone. Here are a few of the checks that matter most.

  • Site measurement verified twice before production
  • Board grade, thickness and edge banding checked at the factory
  • Every shutter and drawer tested for alignment and soft-close
  • Electrical points and lighting circuits tested before ceiling closure
  • Countertop levels and joints checked after installation
  • Paint finish inspected in daylight before handover
Stay updated

Know what is happening on site, even from another city

Daily photos

Your site supervisor shares photos of the day's work every evening.

Weekly walkthrough

A live video call or site visit each week to review progress and decisions.

One project manager

A single WhatsApp group with your project manager, who answers within working hours.

FAQs

Questions about timelines

The handover date is part of your agreement. These are the questions families ask most about it.

45 working days from design sign-off and the 50% milestone payment for most apartments. Villas and homes with civil changes take 60 to 90 days. Your timeline is written into the agreement.
Free consultation

Tell us about your home. A designer calls you within 2 hours.

Share a few details and we will prepare ideas and a rough budget before the first conversation.

  • Free 3D design with every booking
  • Itemised quote within 7 days
  • Meet at home, online or at our experience centre

Book your free consultation

Takes under a minute. We never share your number.

+91